For Business / Create your own
Create your own · for business

Make the board
you actually need

No minimum order. Whether you need a single feature board for reception or 50 branded KPI trackers for a factory, you are in control.

Don’t have a graphic designer? No problem. You can use modern AI tools to generate stunning, one-of-a-kind artwork to upload to our ‘create your own’ feature. It’s faster, cheaper, and infinitely more creative than relying on stock imagery.

We recommend using powerful tools like ChatGPT Plus (DALL-E 3) or Google Gemini Advanced for the best results with text and complex layouts. Claude also handles structured, layout-led designs well.

Minimum order
One board
Made
To order, in Britain
Lead time
3–5 working days
Artwork
Checked before print

No design budget? Just a prompt.

Two boards, two prompts

Both of these boards came out of a single prompt typed into an AI tool, printed straight onto steel. If you have a designer, use them — nothing beats artwork made for you. If the budget will not stretch to one, this gets you a board you are happy to hang.

Describe what you want on your wall — your rota, your menu, your KPIs, your branding — generate it, upload it, and we will make it. Copy one of the prompts below to start, or write your own.

The Minimalist Weekly Planner100 × 75 cm

Seven day columns, nine writing bands each, and a Notes & Priorities band along the bottom. Studios, staff rooms and small offices.

The Agile Scrum Board100 × 75 cm

Three columns, ten numbered task rows, one blue accent on the column that needs policing. Takes a 76 mm sticky three abreast.

Getting started: the golden rules

Three rules, then the library
01
Choose your format

Decide if your board will hang horizontally or vertically and add one of these instructions to the end of every prompt:

For landscape boards
"...Aspect ratio 4:3 landscape."
For portrait boards
"...Aspect ratio 3:4 portrait."
02
Download high-res

Always choose the highest quality/largest file size option when downloading your AI generation.

This matters more than anything else on this page. A board is up to a metre wide, and there is no way to add detail back once it has been generated small.

03
Iterate

AI rarely gets it perfect the first time. Tweak the words, change the colours in the prompt, and regenerate until it’s perfect.

Four or five attempts is normal. Change one thing at a time, so you know which word did the work.

The B2B prompt library

Forty prompts · five sectors

Copy and paste these prompts into your AI tool to get started. Remember to add your aspect ratio at the end! Every board below has been drawn and is ready to print. Roll over any card to read the prompt behind it, then copy it.

Pro-tip for AI text

Let the AI do the design.
Do the words yourself.

AI tools are getting better at text, but sometimes they make spelling mistakes or choose strange fonts.

A Easiest

Use the prompts below to generate the background structure and graphics, but ask the AI to leave the data areas blank. You then use dry-wipe markers on your finished board to fill in the details.

This is also the route we would choose. Anything printed into the coating is there for twenty years, so the less of it that can go out of date, the better.

B Advanced

If you want perfect, permanent text printed on the board, generate your background image using AI, then import it into a free tool like Canva to overlay precise text before uploading it to us.

Set your Canva document to the board’s print size so the type stays sharp, and keep text 20 mm clear of every edge.

01

Organisation & Planning

Offices & home workingScroll for more

These prompts create structured grids perfect for use with dry-wipe markers.

Weekly planner board: seven ruled day columns with sage and dusty blue headers over a Notes and Priorities band The Minimalist Weekly PlannerFrom this prompt

"A clean, minimalist weekly planner grid layout. A calm, timeless palette of muted pastels on white (sage green, soft dusty blue, warm cream). Seven clear vertical columns labeled Monday through Sunday in a modern sans-serif font, with the weekend columns picked out in the blue. A dedicated 'Notes & Priorities' section along the bottom. High quality, flat lay design. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Minimalist Weekly PlannerBuilt
Annual planner board: twelve month boxes in a four by three grid with a deep teal header The Annual Wall PlannerFrom this prompt

"A full academic year wall planner grid (September to August). Clean, functional design with twelve boxes arranged four across and three down, each with its own tinted month header and subdivided into a small grid for days. A color palette of cool greys with a deep teal header band. Clear, legible sans-serif typography. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Annual Wall Planner
Team availability board: ten name rows with photo squares against Monday to Friday columns split into AM and PM The Team Availability BoardFrom this prompt

"A team availability board. Ten name rows down the left with a small square beside each for a photo, and five day columns headed Monday to Friday. Each cell split into AM and PM halves. Cool grey and white with a single green accent. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Team Availability Board
Sprint board: three columns headed To Do, In Progress and Done with ten numbered task rows The Agile Scrum BoardFrom this prompt

"A professional Agile Scrum board layout on a clean white background. Three distinct columns with bold headers: 'TO DO', 'IN PROGRESS', and 'DONE'. Subtle grey grid lines separating rows for tasks, with a numbered gutter down the left of each column. A plain, undated aesthetic, mostly greyscale on white, with one electric blue accent used only on the 'IN PROGRESS' column. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Agile Scrum BoardBuilt
Room booking board: eight blank room rows against half-hour slots from 08:00 to 18:00 with alternating pale hour bands The Meeting Room Booking GridFrom this prompt

"A daily room booking grid. Rooms down the left, half-hour slots across the top from 08:00 to 18:00, with alternating pale bands for each hour. A slim charcoal header with the room name left blank. Flat, clinical, legible from the corridor. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Meeting Room Booking Grid
Project timeline board: twelve week columns, six blank team swimlanes, flat grey bars with one amber critical path and a notes strip The Project Gantt WallFrom this prompt

"A wall-sized project timeline. Twelve week columns across the top, six swimlanes down the left labelled for teams, and long horizontal bars in three flat colours. Muted greys with one amber accent for the critical path. Clean sans-serif labels and plenty of blank space for dry-wipe notes. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Project Gantt Wall
Ninety day goal planner: three month blocks, each with a large numeral, a goal line and four ruled milestone rows The 90 Day Goals WallFrom this prompt

"A ninety-day goal planner in three broad month blocks. Each block has a large numeral, a goal line, and four ruled milestone rows beneath. Warm off-white ground, deep navy type, one coral accent bar across the top. Editorial, calm, uncluttered. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The 90 Day Goals Wall
New starter checklist: Day One, Week One, Month One and Month Three stages, six tick-box rows each The Onboarding ChecklistFrom this prompt

"A new starter onboarding checklist. Four stacked stages headed Day One, Week One, Month One and Month Three, each with six ruled checkbox rows. Soft sage and cream with dark ink lettering. No photographs, no gradients. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Onboarding Checklist
02

Corporate Strategy & Branding

BoardroomsScroll for more

Ideal for high-level overviews and impressing clients.

Branded background board: pale grey and silver geometric tiles on off-white with a few muted blue triangles Subtle Branded BackgroundFrom this prompt

"A sophisticated, abstract background texture for a corporate office wall panel. A modular geometric pattern of triangles, thin line blocks and outlined circles in shades of pale grey and silver on an off-white ground, with a few tiles picked out in muted blue. Flat vector style, no gradients or shadows. The feel is premium, technological, and professional. No text. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

Subtle Branded Background
For overlays
Sales pipeline board: four pale stepped stage blocks outlined in charcoal above a blank Target and Actual grid The Sales Pipeline TrackerFrom this prompt

"A modern sales funnel layout on white. Four stages as solid stepped blocks flowing left to right and descending in height: 'LEAD', 'PROSPECT', 'NEGOTIATION', 'CLOSED'. Each block a pale tint stepping from soft blue through pale teal to pale green, outlined in charcoal, with a large numeral space in the corner. Below the funnel, a two-column grid headed TARGET and ACTUAL for writing monthly figures with a dry-wipe marker. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Sales Pipeline Tracker
Company values panel: five numbered values on warm off-white with brass rules and ruled writing space The Company Values PanelFrom this prompt

"A reception wall panel presenting five company values. Each value gets a large numeral, a one-word heading in heavy caps, and a single line of supporting text beneath. Warm off-white ground, deep charcoal type, one brass accent rule. Confident, architectural, generous margins. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Company Values Panel
SWOT board: four white quadrants with navy header bars and faint ruled writing lines over a pale blueprint grid The Blueprint SWOT AnalysisFrom this prompt

"A 2x2 matrix grid designed for a SWOT analysis. The aesthetic should look like an architectural blueprint: fine navy grid lines over a pale blue-white ground. Four equal quadrants, each with a navy header bar and a numbered label in bold technical caps: STRENGTHS, WEAKNESSES, OPPORTUNITIES, THREATS. Faint ruled writing lines inside each quadrant, left white so they can be written on. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Blueprint SWOT Analysis
OKR scoreboard: three objective bands, each with three key result rows and blank score boxes The OKR ScoreboardFrom this prompt

"An objectives and key results scoreboard. Three objective bands stacked down the page, each with a headline row and three key result rows with a blank score box on the right. Flat white with slate headers and one electric blue accent on the boxes. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The OKR Scoreboard
Blank organisation chart: one box at the top, three below and nine across the bottom, joined by right-angled connectors The Org Chart WallFrom this prompt

"A blank organisation chart. One box at the top, three below it, and nine across the bottom row, joined by clean right-angled connector lines. Pale grey boxes with dark outlines on a white ground, every box left empty for writing in names. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Org Chart Wall
Customer journey map: five tall columns headed Awareness, Consideration, Purchase, Onboarding and Advocacy with stage numerals and ruled notes The Customer Journey MapFrom this prompt

"A five-stage customer journey map running left to right: Awareness, Consideration, Purchase, Onboarding, Advocacy. Each stage is a tall column with a stage numeral, a plain header bar, and ruled note space below. Muted teal palette, flat vector, no gradients. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Customer Journey Map
Quarterly review board: four panels headed Q1 to Q4, each with a small results grid and a wide comment field The Quarterly Review BoardFrom this prompt

"A quarterly review board. Four equal panels headed Q1 to Q4, each with a small results grid and a wide comment field. Restrained navy and stone palette with a red rule separating the header from the body. Corporate, clean, undecorated. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Quarterly Review Board
03

Hospitality & Retail

Cafes, bars & shopsScroll for more

Create the trendy “hand-drawn” look without the chalk dust.

Coffee menu board: warm off-white ground with brown and brass type, three tinted section bars and ruled lines for items The Vintage Coffee MenuFrom this prompt

"A menu board design for a coffee shop. Warm off-white ground with deep brown and brass type. A large display word at the top left, and a simple geometric coffee mark in the top right built from a circle and an arc. Three tinted section bars headed 'ESPRESSO BAR', 'FILTER BREWS', and 'BAKERY', with faint ruled lines below each for handwritten items. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Vintage Coffee Menu
Chef’s specials board: cream ground inside a forest green double rule with a large display header and blank ruled field The ‘Daily Specials’ A-Board StyleFrom this prompt

"A bistro-style 'Daily Specials' board. A warm cream ground inside a deep forest-green double-ruled border with small dots at the mid-points. A large two-line display header reading 'CHEF'S SPECIALS', the second line in warm brass on the cream ground. A short rule beneath it and a wide blank ruled field below for handwriting. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The ‘Daily Specials’ A-Board Style
Shop entrance panel: large WELCOME, a seven row opening hours grid with blank time fields and a website footer strip The Welcome & Hours PanelFrom this prompt

"A shop entrance panel. A large welcome word at the top, a seven-row opening hours grid with blank time fields, and a footer strip for a website address. Monochrome with a single mustard accent. Crisp geometric sans-serif. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Welcome & Hours Panel
Wine list board: cream ground in a burgundy frame with By The Glass, Bottles and Dessert sections ruled for handwriting The Wine List BoardFrom this prompt

"A restaurant wine list board. Three sections headed By The Glass, Bottles and Dessert, each with faint ruled lines for handwritten entries. Warm cream ground inside a deep burgundy frame, burgundy serif display type, a thin gold rule under each section head. Elegant, no illustrations. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Wine List Board
Tap list board: pale ground inside a riveted slate frame with Tap No, Beer Style and ABV columns over eight blank rows The Craft Beer Tap ListFrom this prompt

"An industrial beer tap list design. A pale grey-white ground inside a dark slate riveted frame. Bold slate headers for 'TAP NO.', 'BEER STYLE', and 'ABV%', underlined with an amber rule. Eight empty rows below for writing in daily rotations. Flat, high-contrast, no textures. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Craft Beer Tap List
Bakery counter board: wide FRESH TODAY header over two columns of ruled lines for bakes and prices The Bakery Counter BoardFrom this prompt

"A bakery counter display board. A wide header reading FRESH TODAY in warm brown caps, then two columns of ruled lines for the day’s bakes and prices. Warm cream ground with soft terracotta banding. Flat, appetising, uncluttered. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Bakery Counter Board
Cocktail board: chalk white ground inside a double border with a blank name panel, five ingredient lines and a price box The Cocktail of the WeekFrom this prompt

"A bar feature board for a single cocktail: a big name field, a ruled ingredients list, and a price box in the bottom corner. Chalk-white ground inside a thin double border of inky blue-black and brass, with blush pink and brass type. Classic, balanced proportions, no illustration. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Cocktail of the Week
Front of house service board: twenty numbered table boxes against Covers, Time and Notes columns The Covers & Table PlanFrom this prompt

"A front of house service board. Twenty table numbers in boxes down the left, with columns headed Covers, Time and Notes. Clean white with charcoal rules and one green accent on the header row. Designed to be written on and wiped twice a day. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Covers & Table Plan
04

Industry & Manufacturing

Lean & safetyScroll for more

High-contrast, rugged designs for clear visual management on the shop floor.

Site safety board: hazard yellow header over a white body with a large days counter and blank hazard and action panels The ‘Safety First’ TrackerFrom this prompt

"An industrial safety management board. A hazard-yellow header band across the top with 'SITE SAFETY STATUS' in heavy black caps, separated from a white body by a red rule. A large outlined box in the centre holding a placeholder figure '000', with 'DAYS WITHOUT LOST TIME ACCIDENT' in black caps beneath it. Flat, high-contrast, no textures. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The ‘Safety First’ Tracker
Production KPI board: three gauge dials over white Target and Actual grids inside a charcoal frame Production Team KPIsFrom this prompt

"A factory floor KPI dashboard layout. An off-white ground inside a charcoal frame, with three semicircular gauge dials across the top labeled 'OUTPUT', 'QUALITY', and 'UPTIME', each with tick marks and a filled arc in a different accent: teal, amber, red. Below each gauge, a two-column grid headed TARGET and ACTUAL for writing shift figures. Clear, rugged, flat design. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

Production Team KPIs
Shift handover board: Early, Late and Nights columns against Output, Issues, Machine Status and Handover Notes rows The Shift Handover BoardFrom this prompt

"A shift handover board. Three columns headed Early, Late and Nights, each with rows for Output, Issues, Machine Status and Handover Notes. A black on safety-yellow header over a white body with heavy rules. Rugged and legible from three metres. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Shift Handover Board
Line status board: six line rows on white against Running, Attention and Stopped columns of open circles The Line Status BoardFrom this prompt

"A production line status board. Six line names down the left, and three status columns headed Running, Attention and Stopped with large empty circles to mark. White ground with a charcoal header band and status circles in green, amber and red. No textures, no shadows. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Line Status Board
5S board: five numbered columns in red, white and grey with score boxes The 5S Audit BoardFrom this prompt

"A functional 5S visual management station board. A red header band, then five equal vertical sections each with a large red numeral and a bold header: 'SORT', 'SET IN ORDER', 'SHINE', 'STANDARDISE', 'SUSTAIN'. A small score box marked /5 under each header and ruled lines below. A red, white and cool grey scheme geared towards manufacturing efficiency. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The 5S Audit Board
Planned maintenance chart: blank machine rows against twelve month columns of empty tick squares The Maintenance ScheduleFrom this prompt

"A planned maintenance wall chart. Machine names down the left, twelve month columns across, each cell a blank square for marking service dates. Steel grey and white with a blue header band and bold tick-friendly cells. Functional and stark. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Maintenance Schedule
Toolbox talk board: hazard yellow header, topic field, key message area and a five row attendance list with signature lines The Toolbox Talk BoardFrom this prompt

"A weekly toolbox talk board. A topic header field, a five-row attendance list with signature lines, and a large blank area for the key message. Hazard yellow header band, black type, thick black frame. Built to be read on a noisy shop floor. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Toolbox Talk Board
Quality defect board: a six bar Pareto area with a red axis above a table headed Defect, Count, Owner and Action The Defect TrackerFrom this prompt

"A quality defect board. A large Pareto-style bar area at the top with six blank bars and an axis, and a table below headed Defect, Count, Owner and Action. White ground, charcoal type, one red accent on the axis. Technical and precise. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Defect Tracker
05

Healthcare & Education

Clean & clearScroll for more

Hygienic-looking, friendly, and clear communication tools.

Ward staffing board: white with a teal frame and four photo slots The Hospital Staff on DutyFrom this prompt

"A professional, hygienic hospital ward staffing board. A clean white background inside a bold teal frame. Four equal columns with tinted headers for 'CONSULTANT IN CHARGE', 'REGISTRAR', 'NURSE MANAGER', and 'ON CALL'. Each column holds a large empty rectangular slot suitable for a magnetic photo, with ruled name lines below, and a handover notes bar runs along the bottom. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Hospital Staff on Duty
School timetable board: five day columns against eight numbered period rows in teal, mustard and off-white The Classroom TimetableFrom this prompt

"A school timetable board. Five day columns and eight period rows, every cell blank for writing. A restrained palette of teal, mustard and off-white with a bold header band and clearly numbered periods. Friendly and legible from the back row. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Classroom Timetable
Kitchen rota board: Memphis shapes in coral, teal, yellow and violet around a seven-day grid Student Accommodation Kitchen RotaFrom this prompt

"A fun, vibrant cleaning rota for student halls. A warm cream background with simple flat shapes scattered around the edges: coral circles, teal squiggles, yellow triangles and violet dots. A clear seven-day grid with tasks listed down the left (Bins, Surfaces, Hob, Floor, Fridge). Cheerful, flat and engaging. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

Student Accommodation Kitchen Rota
Bedside patient board: ruled fields for Name, Today’s Date, My Nurse, My Goals and Questions For The Team The Bedside Patient BoardFrom this prompt

"A bedside patient information board. Fields for Name, Today’s Date, My Nurse, My Goals and Questions For The Team, each with generous ruled writing space. Calm pale blue and white with dark ink labels. Reassuring and uncluttered. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Bedside Patient Board
Hand hygiene panel: five numbered steps down the page with blank icon squares and a compliance score box The Infection Control PanelFrom this prompt

"A hand hygiene panel. Five numbered steps down the page, each with a blank square beside it for an icon, a header band in clinical teal, and a compliance score box in the corner. Flat, hygienic, high contrast. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Infection Control Panel
Vet ward board: four-column grid on soft blue with pastel circles behind The Veterinary ‘Pet Patients’ BoardFrom this prompt

"A friendly, clean whiteboard design for a vet clinic ward. A soft pastel blue ground with large quiet circles in pale green and blue drifting behind the layout. A deep teal header band, then a four-column grid with tinted headers: 'PATIENT NAME', 'OWNER', 'PROCEDURE', 'RECOVERY STATUS', and eight ruled rows beneath. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Veterinary ‘Pet Patients’ Board
Revision planner: six subject rows against a twelve week grid of blank tick boxes with an exam date footer The Revision PlannerFrom this prompt

"A student revision planner. Six subject rows down the left and a twelve-week grid across, with small blank boxes to tick off sessions. Soft lilac and cream with a dark header band and a one-line footer field. Calm, tidy, unfussy. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Revision Planner
Student union noticeboard: large EVENTS header over four blank poster panels with pin marks and a contact footer The Society NoticeboardFrom this prompt

"A student union noticeboard layout. A large EVENTS header, four blank poster-sized panels with pin-corner marks, and a footer strip for contact details. Bold primary colours blocked flat with thick black rules, every panel left cream inside. A bold, undated poster feel, no photographs. Keep every writing area white or very pale so it can be filled in with a dry-wipe pen, keeping any dark colour to frames and header bands, and make the blank fields as large as the layout allows."

The Society Noticeboard

What resolution actually means at this size

Our production standard is 150 dpi at full print size. On a large board that is 5965 × 4488 pixels — considerably larger than most AI tools generate in one pass. It is worth knowing this before you fall in love with an image.

The good news is that viewing distance is forgiving. A texture or abstract ground read from across a room survives far less resolution than fine line work or small type. Our upload tool measures your file against the board you have chosen and tells you where you stand before you commit.

If your generation lands short, the two reliable routes are to run it through an AI upscaler before uploading, or to choose a smaller board.

Your file On a large board Verdict
1024 × 768 26 dpi Too low
1792 × 1024 45 dpi Upscale first
2048 × 1536 51 dpi Upscale first
4096 × 3072 103 dpi Fine for texture
5965 × 4488 150 dpi Production standard
Also

Every board has a 5 mm bleed on each edge and 35 mm radius corners. Keep anything you cannot afford to lose — logos, headings, the edge of a grid — at least 20 mm inside the edge of your image, and expect the very corners to be rounded off.

One board or fifty. Same steel either way.

Made to order in Britain in high-grade steel, with a high-gloss dry-erase surface that takes everything from traditional ferrous magnets to neodymium.

Upload it, see it, order it

Create your own · for business

The business version of our Create Your Own tool runs on this page, below. It is the same preview engine as the retail tool, with the order details a business needs sitting underneath it: quantity per design, a purchase order reference, and a proof to sign off before anything is printed.

Step 01
Choose size and format

Three sizes, landscape or portrait. The tool shows the live print size, the 5 mm bleed and the rounded corners as you choose.

Step 02
Upload and position

Drag to reframe and zoom to crop. A resolution check runs against the board you picked and warns you before you can order something that will print soft.

Step 03
See it on a wall

Switch from the product view to a room view at true scale, so you can judge the size properly before committing to fifty of them.

Step 04
Quantity, PO, proof

Set the quantity, add a purchase order reference, and ask for a PDF proof. We check every file by hand before it goes to print.

Create your own · business configuratorLive on this page
Create Your Own · Board Business — quantities, PO and proof
Business pricing applied at checkout
Drop your artwork
on the board
or click to browse
Awaiting your file
Bleed
Orientation
The board turns to suit your photograph.
Board size
Each size is drawn to scale, so a small board looks smaller than a large one.
Screw caps
Both sets come in the box. The preview shows the ones you choose.
635 reviews Ex. VAT · per board
Larger runs quoted on request
We confirm the file by email before production. Despatch in three to five working days.
Before we print Your order carries the original file untouched, the crop, the board size and orientation, the cap colour, the print size with bleed and the measured dpi against our 150 standard. We check every file by hand and send a PDF proof before anything goes to print, so nothing is manufactured on a misunderstanding.
Order details

These travel with the board above when you add it to your business order.

Send a PDF proof for approval before printing. We check every file by hand and will tell you if the resolution will not hold at the size you have chosen.

How you would like to pay
Checkout by cardRaise a purchase order

Card checkout takes payment now and sends the board straight to production once the proof is signed off. A purchase order issues a proforma invoice against your PO reference, payable on your agreed terms, and we hold the job until it clears.

Prices shown ex VAT; VAT is added at checkout.

Your artwork stays with the order. The file you position here is attached to the order as it passes into checkout, sized at print size with the bleed, the corner radius and the fixing positions already applied, so there is nothing to download and nothing to send on separately.

Rather not do it yourself?

Send us the prompt you liked and a rough idea of your branding, and we will generate and prepare the artwork for you. Our design service is quoted per job.

Talk to us

Trade orders are quoted individually, with a named contact for repeat orders and every artwork file you send us kept on file so a reorder is one email.